Rocksolid Light

Welcome to Rocksolid Light

mail  files  register  newsreader  groups  login

Message-ID:  

Diplomacy is to do and say, the nastiest thing in the nicest way. -- Balfour


aus+uk / uk.rec.cycling / Hull’s large wind turbine dismantled after fire

SubjectAuthor
* Hull’s large wind turbine dismantledSpike
`- Re: Hull’s large wind turbine dismantled afterJNugent

1
Hull’s large wind turbine dismantled after fire

<kgoo6jFhc9eU1@mid.individual.net>

  copy mid

https://news.novabbs.org/aus+uk/article-flat.php?id=30981&group=uk.rec.cycling#30981

  copy link   Newsgroups: uk.rec.cycling
Path: i2pn2.org!i2pn.org!weretis.net!feeder8.news.weretis.net!fu-berlin.de!uni-berlin.de!individual.net!not-for-mail
From: Aero.Spike@mail.invalid (Spike)
Newsgroups: uk.rec.cycling
Subject: Hull’s large wind turbine dismantled
after fire
Date: 6 Jul 2023 20:57:55 GMT
Lines: 26
Message-ID: <kgoo6jFhc9eU1@mid.individual.net>
Mime-Version: 1.0
Content-Type: text/plain; charset=UTF-8
Content-Transfer-Encoding: 8bit
X-Trace: individual.net 4UE8uublUwzx7Q5oQSu67wf/AsgLnMDCCcDvAG8cWf3R3G1Gke
Cancel-Lock: sha1:JOPhNccoLFiga2EQYn5kqxwKAzY= sha1:8qEuL7ZTE77oJS9me6DTpsq/GIY= sha256:G/KlKmYeLPoC/8YgTuwK6MQlbaKv3uFtsASGT2FMtGo=
User-Agent: NewsTap/5.5 (iPhone/iPod Touch)
 by: Spike - Thu, 6 Jul 2023 20:57 UTC

'Extreme caution' as Hull's first large wind turbine to be taken down
following major blaze

The turbine blades were removed just last month

ByJack Bowman
12:10, 6 JUL 2023

Extreme caution is needed as the operation to take down Hull's first large
wind turbine continues following a major fire.

The wind turbine, located at Cargill's Hull factory, set on fire back in
August 2022, prompting a huge emergency response. It is thought the fire is
likely to have been triggered by either an electrical or mechanical fault.

In June, the dismantling progress was underway as the turbine blades were
taken down by a huge mechanical arm. An update from the company behind the
turbine, Cargill, says that a specialist has been hired to take down the
rest of the turbine, with work being aimed to be completed before the end
of July.

<https://www.hulldailymail.co.uk/news/hull-east-yorkshire-news/extreme-caution-hulls-first-large-8575591>

--
Spike

Re: Hull’s large wind turbine dismantled after fire

<kgp024FiioqU1@mid.individual.net>

  copy mid

https://news.novabbs.org/aus+uk/article-flat.php?id=30984&group=uk.rec.cycling#30984

  copy link   Newsgroups: uk.rec.cycling
Path: i2pn2.org!i2pn.org!weretis.net!feeder8.news.weretis.net!fu-berlin.de!uni-berlin.de!individual.net!not-for-mail
From: jnugent@mail.com (JNugent)
Newsgroups: uk.rec.cycling
Subject: Re:_Hull’s_large_wind_turbine_dismantled_after_
fire
Date: Fri, 7 Jul 2023 00:12:04 +0100
Organization: Home User
Lines: 26
Message-ID: <kgp024FiioqU1@mid.individual.net>
References: <kgoo6jFhc9eU1@mid.individual.net>
Reply-To: jnugent@mail.com
Mime-Version: 1.0
Content-Type: text/plain; charset=utf-8; format=flowed
Content-Transfer-Encoding: 7bit
X-Trace: individual.net BJ7AjXjxo3rx7nnfatn8NQkew6OPQ9bEa+DlOjJ8EUnFTVghQA
Cancel-Lock: sha1:n2n34chvyhiOkddu60dvxvqY3lI= sha256:gd8+CSBGGH0wgNqrfrUE9/IoXVSkt+mh0MCfVWBIZkI=
User-Agent: Mozilla/5.0 (Windows NT 10.0; WOW64; rv:60.0) Gecko/20100101
Thunderbird/60.6.1
In-Reply-To: <kgoo6jFhc9eU1@mid.individual.net>
Content-Language: en-GB
X-Antivirus: AVG (VPS 230706-6, 7/6/2023), Outbound message
X-Antivirus-Status: Clean
 by: JNugent - Thu, 6 Jul 2023 23:12 UTC

On 06/07/2023 09:57 pm, Spike wrote:
>
> 'Extreme caution' as Hull's first large wind turbine to be taken down
> following major blaze
>
> The turbine blades were removed just last month
>
> ByJack Bowman
> 12:10, 6 JUL 2023
>
> Extreme caution is needed as the operation to take down Hull's first large
> wind turbine continues following a major fire.
>
> The wind turbine, located at Cargill's Hull factory, set on fire back in
> August 2022, prompting a huge emergency response. It is thought the fire is
> likely to have been triggered by either an electrical or mechanical fault.
>
> In June, the dismantling progress was underway as the turbine blades were
> taken down by a huge mechanical arm. An update from the company behind the
> turbine, Cargill, says that a specialist has been hired to take down the
> rest of the turbine, with work being aimed to be completed before the end
> of July.
>
> <https://www.hulldailymail.co.uk/news/hull-east-yorkshire-news/extreme-caution-hulls-first-large-8575591>

Couldn't they have used to Fred Dibnah / Blaster Bates method?

1
server_pubkey.txt

rocksolid light 0.9.81
clearnet tor